Discharge of conditions: 9, 9A, 9B, 9C, 9E, 9F, 9G, 11, 13, 14, 15 & 17
Original Application
16/00986/AS | Former Travis Perkins Trading Co Ltd, Victoria Crescent, TN23 7HP | Demolition of existing buildings and erection of 28 flats with car parking, access and associated landscaping | 6 July 2016 |
Conditions
- Prior to any construction above ground level, written details including source/manufacturer, and samples of bricks, tiles and cladding materials to be used externally shall be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out using the approved external materials. Furthermore, prior to any construction above ground level the details set out below shall be submitted to and approved in writing by the Local Planning Authority and, thereafter, the development shall only be carried out in accordance with the approved details unless agreed otherwise by the Local Planning Authority in writing;-
- full details of glazing and external doors, including all external joinery and
framing methods and external colour and the depth of recess of window and
door frames in brick reveals (1:20), - sections, elevations and colour finish of external rainwater goods (1:20)
- elevations sufficient to show the extent of proposed textured brickwork areas and use of brick soldier course detailing (1:50) and typical sections sufficient to illustrate the depth of any projection or recess (1:20)
- elevations, materials and external colour of entrance canopies to the circulation core (1:20)
- sections, elevations and colour finish to proposed balconies to shown handrail and balustrades (1:10)
- surfacing treatment and intended demarcation of private terraces serving ground floor apartments
- elevations and sections of brick boundary walls (including piers) and railings affixed thereto including specification, finials and colour finish
- full details of glazing and external doors, including all external joinery and
- Prior to the installation of services, full details of the soft landscaping (including tree planting) works shall be submitted to and approved in writing by the Local Planning Authority. The details of the soft landscaping (including tree planting works) to be submitted to the Local Planning Authority for approval shall include the following;-
- the planting plans;
- written specifications (including cultivation and other operations associated with plant and grass establishment);
- details of the planting that is designed to create year round colour;
- schedules of plants noting species, plant & tree sizes and proposed numbers/densities/girth where appropriate;
- full tree pit details (including surface level plan detailing, below ground sections and dimensions and fill specification)
- an implementation and planting programme/timetable to ensure that all soft landscaping and planting is completed within 6 months of the completion of the development.
The soft landscaping (including tree planting) works shall be implemented in full in accordance with the details and timetable approved by the Local Planning Authority unless written approval has been given by the Local Planning Authority to any subsequent variation.
- Prior to the first occupation of any apartment in the building, a landscape management plan including long term design objectives, management responsibilities and maintenance schedules for the landscape areas and the timing of provision of management and maintenance of such areas shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the landscape management plan shall be carried out in accordance with the details approved by the Local Planning Authority unless previously agreed otherwise in writing by the Local Planning Authority.
-
- The apartment building hereby permitted shall not be first occupied until a report prepared by SLR, or a similarly qualified firm, has been provided to the Local Planning Authority confirming that a sustainable surface water drainage scheme, based on the proposals within the SLR Flood Risk Assessment Ref.408.06248.00001 June 2016 has been installed. The report should demonstrate that the surface water generated by this development (for all rainfall durations and intensities up to and including the climate change adjusted critical 100yr storm) can be accommodated and disposed of without increase to flood
risk. - The apartment building hereby permitted shall not be first occupied until details of the implementation, maintenance and management of the sustainable drainage scheme have been submitted to and approved in writing by the local planning authority. The scheme shall be implemented and thereafter managed and maintained in accordance with the approved details unless the local planning authority has agreed to any variation in writing. Those details shall include:
- a timetable for its implementation, and,
- a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the operation of the sustainable drainage system throughout its lifetime.
- The apartment building hereby permitted shall not be first occupied until a report prepared by SLR, or a similarly qualified firm, has been provided to the Local Planning Authority confirming that a sustainable surface water drainage scheme, based on the proposals within the SLR Flood Risk Assessment Ref.408.06248.00001 June 2016 has been installed. The report should demonstrate that the surface water generated by this development (for all rainfall durations and intensities up to and including the climate change adjusted critical 100yr storm) can be accommodated and disposed of without increase to flood
- The apartment building hereby permitted shall achieve the minimum optional requirement set out in the Building Regulations for water efficiency that requires
an estimated water use of no more than 110 litres per person per day.
- Prior to the occupation of the development, the following details have been submitted to and (following consultation with the Environment Agency) agreed in writing by the Local Planning Authority in writing;-
-
- proposed fencing/railings and soft landscaping forming the southern boundary to the parking court,
- the location and width of secure access gates within the southern boundary to the parking court sufficient to enable access to the river bank for maintenance
purposes, - details of proposed benches including ability to be removed as required during river bank maintenance.
Thereafter the development shall be carried out in accordance with such details unless the Local Planning Authority has agreed in writing to any such variation.
-