Former Pledges Mill and South Kent College Site and Land south of junction of Beaver Road and, Victoria Road – decided

Discharge of condition 89 Part Discharge 36 Part A, 64 Part A Part Discharge 33 & 61 Brick Type

17/01759/CONE/AS

Decided: Permit

Original Application

Case Ref Description Posted on
17/01759/AS Proposed minor material amendments to planning permission 16/01157/AS involving design changes to Phase A2 (X3 commercial uses (Use Classes A1/A2/B1) &; Phase A3 (216 residential units) with associated parking, substations, landscaping and access works relating to land south of Victoria Road ONLY with no design changes to the approved development of land north of Victoria Road for the purposes of a brewery with shop, bar and restaurant (use classes B2/A1/A3/A4).Full planning application for development of a brewery, with shop, bar and restaurant (Use Classes B2/A1/A3/A4), three commercial units (Use Classes A1/A2/B1) and 216 residential units with associated parking, substations, landscaping and access works. 12 Dec 2017
16/01157/AS Full planning application for development of a brewery, with shop, bar and restaurant (Use Classes B2/A1/A3/A4), three commercial units (Use Classes A1/A2/B1) and 216 residential units with associated parking, substations, landscaping and access works. 10 Aug 2016

Conditions

LAND FORMING PHASE A2 TO SOUTH OF VICTORIA ROAD
(RESIDENTIAL AND COMMERCIAL – C3/B1/A1/A2/A3)
Materials
  1. Prior to installation, written details including source/ manufacturer, and samples of bricks, tiles and cladding materials (including jointing of panels) to be used externally shall be submitted to and approved in writing by the Local Planning Authority and the development of land forming Phase A2 shall be carried out using the approved external materials. The details shall be supplied as appropriate on a materials board.
Fine details
  1. Prior to installation, unless specified to the contrary, the details set out below shall be submitted to and approved in writing by the Local Planning Authority and, thereafter, development shall only be carried out in accordance with the approved details unless agreed otherwise by the Local Planning Authority in writing. Where relevant, the following details should be provided on drawings at an appropriate scale of 1:50 (where detail needs to be considered contextually related to a façade) and at 1:20 in other cases:-
    1. full details of glazing and external doors, including all external joinery and framing methods and external colour (1:20),
    2. 1:20 horizontal and vertical cross sections through typical sections of each of the facades sufficient to show the relationship between the façade and those elements of detail to be embedded within the façade as well projecting from it (such as the extent of recessing of glazing and doors in openings created in the façade, the consequential treatment of window reveals, the details of cills and the extent of projecting elements from the façade),
    3. 1:100 elevation detailing the locations of all expansion joints in facades,
    4. details of any plant or machinery proposed on the roof and associated screens,
    5. details of any satellite dishes or antenna,
    6. details of rainwater goods, eaves, fascia and entrance canopies (including materials and finish, details of any supporting posts and related brick plinths and roofing materials),
    7. details of vents, louvres, extractor vents, external pipes, meters etc.
    8. details of screens and windbreaks,
    9. 1:50 scale details of the parapet capping,
    10. details of external entrance steps, handrails and balustrades.
LAND FORMING PHASE A3 TO SOUTH OF VICTORIA ROAD (RESIDENTIAL BUILDING)
Materials
  1. Prior to installation, written details including source/ manufacturer, and samples of bricks, tiles, feature panels and cladding materials (including jointing of panels) to be used externally shall be submitted to and approved in writing by the Local Planning Authority and the development of land forming Phase A3 shall be carried out using the approved external materials. The details shall be supplied as appropriate on a materials board.
Fine details
  1. Prior to usage in the building on the land forming Phase A3 above ground level, the details set out below shall be submitted to and approved in writing by the Local Planning Authority and, thereafter, development shall only be carried out in accordance with the approved details unless agreed otherwise by the Local Planning Authority in writing. Where relevant, the following details should be provided on drawings at an appropriate scale of 1:50 (where detail needs to be considered contextually related to a façade) and at 1:20 in other cases:-
    1. full details of glazing and external doors, including all external joinery and framing methods and external colour (1:20),
    2. 1:20 horizontal and vertical cross sections through typical sections of each of the facades sufficient to show the relationship between the façade and those elements of detail to be embedded within the façade as well projecting from it (such as the extent of recessing of glazing and doors in openings created in the façade, the consequential treatment of window reveals, the details of cills and the extent of projecting elements from the façade),
    3. 1:100 elevation detailing the locations of all expansion joints in facades,
    4. details of any plant or machinery proposed on the roof and associated screens,
    5. details of any satellite dishes or antenna,
    6. details of rainwater goods, eaves, fascia and entrance canopies (including materials and finish, details of any supporting posts and related brick plinths and roofing materials),
    7. details of vents, louvres, extractor vents, external pipes, meters etc.
    8. details of screens and windbreaks,
    9. 1:50 scale details of the parapet capping,
    10. details of external entrance steps, handrails and balustrades.
Adaptation of ground floor units to meet wheelchair user requirements
  1. Prior to the laying of foundations to the building approved to be constructed on the land forming Phase A3, a plan to show the location of five apartments available for adaptation to meet wheelchair user requirements shall be submitted to, and approved by, the Local Planning Authority in writing and thereafter the development shall only proceed in accordance with such details unless the Local Planning Authority has agreed to any variation in writing.

1 Comment

  1. Bob Shrubb (Post author)

    Amended to reflect decision

Comments are closed.