Jemmett Road

In 2015 South Ashford Community Forum raised the condition of Brookfield Road and Jemmett Road at one of it’s meetings. We were told “There are jetpatching works scheduled for Brookfield Road in coming weeks and Jemmett Road has been patched in recent months. The specific roads referred to are structurally sound and therefore do not require reconstruction as suggested.”

The County Councillor commented that Brookfield Road is the priority due to the sheer traffic volume which includes heavy vehicles. To ensure a more permanent solution the concrete slabs need to be taken out and new surface laid down. The patching work at Jemmett road is not to satisfactory standards.
We pointed out that when Ashford College move out of their site in Jemmett Road, the demolition and construction works on the site could potentially damage Jemmett Road.

At the time we photographed the defects in Jemmett Road.

As the works on the college site are now well advanced we have raised the issue again with the current County Councillor and carried out a further photographic survey. The photographs have been plotted on a Google Map which can be viewed at https://drive.google.com/open?id=1MNtG_QOD6T7E_Huinyni6yierYk

  • Photographs taken in 2019 are shown by red markers
  • Those taken in 2015 are shown by blue markers
  • Green markers have similar photographs taken in 2019 and 2015

The photographs show a severe deterioration in the general condition of the road and that repairs undertaken in or before 2015 are themselves beginning to fail.

Leave a Comment

Your email address will not be published. Required fields are marked *